J-Light 2.0 Badge Tracker System

 

Project Deliverables

Page history last edited by Aaron 1 yr ago

Project Deliverables

 

The following are expected to be included upon purchasing the system:

  1. A system for tracking students, as per the specifications provided
  2. The software for controlling and otherwise interacting with the system
  3. A manual detailing the specifics of maintaining and using the system
  4. Adequate training sessions
  5. A warranty of negotiable length
  6. Full APIs and specifications for software/hardware interface
  7. Installation services
  8. At least one year of software updates and on-site tech support
  9. Enough sensors for current facility
  10. Enough badges for current students and personnel, plus approximately 10% extra for growth
  11. Ability to redefine and scale facility parameters (i.e. size and shape of facility) and add/remove equipment (sensors, badges, etc.)

Comments (0)

You don't have permission to comment on this page.